Length: 8,000 ft. | Project size: $7.9 million | 2 Bridges, @ Bayless – 600 ft., @ River Des Peres – 300 ft. | Location
Challenges in this project: River Des Peres flooding caused delays in bridge construction – redesign for drilled shafts to pile foundations for bridge was required.
Location
HWY 55 @ Bayless Ave over River Des PeresSt. Louis







